Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

NFPA 59A: Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG), 2026
- Important Notices and Disclaimers
- Additional Important Notices and Disclaimers
- Chapter 1 Administration [Go to Page]
- 1.1 Scope.
- 1.2 Purpose.
- 1.3 Retroactivity.
- 1.4 Equivalency.
- 1.5 SI Units.
- 1.6 Pressure Measurement.
- 1.7 Referenced Standards.
- Chapter 2 Referenced Publications [Go to Page]
- 2.1 General.
- 2.2 NFPA Publications.
- 2.3 Other Publications.
- 2.4 References for Extracts in Mandatory Sections.
- Chapter 3 Definitions [Go to Page]
- 3.1 General.
- 3.2 NFPA Official Definitions.
- 3.3 General Definitions.
- Chapter 4 General Requirements [Go to Page]
- 4.1 Scope.
- 4.2 Designer and Fabricator Competence.
- 4.3 Soil Protection for Cryogenic Equipment.
- 4.4 Falling Ice and Snow.
- 4.5 Concrete Design and Materials.
- 4.6 Engineering ReviewManagement of Changes.
- 4.7 Control Center.
- 4.8 Sources of Power.
- 4.9 Records.
- 4.10 Noncombustible Material.
- 4.11 Ignition Source Control.
- 4.12 Facility Lighting.
- Chapter 5 Plant Siting [Go to Page]
- 5.1 Scope.
- 5.2 Plant Site Provisions.
- 5.3 Site Provisions for Spill and Leak Control.
- Chapter 6 Plant Layout [Go to Page]
- 6.1 Scope.
- 6.2 General Layout.
- 6.3 Container Spacing.
- 6.4 Vaporizer Spacing.
- 6.5 Process Equipment Spacing.
- 6.6 Loading and Unloading Facility Spacing.
- 6.7 Buildings and Structures.
- 6.8 Impoundment Spacing.
- Chapter 7 Process Equipment [Go to Page]
- 7.1 Scope.
- 7.2 General Requirement.
- 7.3 Installation of Process Equipment.
- 7.4 Pumps and Compressors.
- 7.5 Hazardous Liquid Storage.
- 7.6 Process Equipment.
- Chapter 8 Stationary LNG Storage [Go to Page]
- 8.1 Scope.
- 8.2 General.
- 8.3 Design Considerations.
- 8.4 Tank Systems.
- 8.5 ASME Containers.
- Chapter 9 Vaporization Facilities [Go to Page]
- 9.1 Scope.
- 9.2 Classification of Vaporizers.
- 9.3 Design and Materials of Construction.
- 9.4 Vaporizer Shutoff Valves.
- 9.5 Relief Devices on Vaporizers.
- 9.6 Combustion Air Supply.
- 9.7 Products of Combustion.
- Chapter 10 Piping Systems and Components [Go to Page]
- 10.1 Scope.
- 10.2 General.
- 10.3 Materials of Construction.
- 10.4 Installation.
- 10.5 Isolation of Hazardous Fluid Equipment and Systems.
- 10.6 Pipe Supports.
- 10.7 Piping System and Component Identification.
- 10.8 Inspection, Examination, and Testing of Piping.
- 10.9 Purging of Piping Systems.
- 10.10 Safety and Relief Valves.
- 10.11 Flares and Vent Stacks.
- 10.12 Corrosion Control.
- 10.13 Cryogenic Pipe-in-Pipe Systems.
- 10.14 Below-Ground or Subsea Installation.
- Chapter 11 Instrumentation and Electrical Services [Go to Page]
- 11.1 Scope.
- 11.2 General.
- 11.3 Liquid Level Gauging.
- 11.4 Pressure Gauging.
- 11.5 Vacuum Gauging.
- 11.6 Temperature Indicators.
- 11.7 Control Systems.
- 11.8 Fail-Safe Design.
- 11.9 Electrical Equipment.
- 11.10 Electrical Grounding and Bonding.
- Chapter 12 Plant Facilities Design [Go to Page]
- 12.1 Design Classification.
- 12.2 Plant Facilities Design.
- 12.3 Seismic Design.
- 12.4 LNG Containers.
- 12.5 Buildings or Structural Enclosures.
- 12.6 Fire and Explosion Control.
- 12.7 Ventilation.
- 12.8 Flammable Gas or Vapor Control.
- 12.9 Occupant Protection.
- Chapter 13 Impounding Area and Drainage System Design and Capacity [Go to Page]
- 13.1 Single Container Impounding Areas.
- 13.2 Multiple Container Impounding Areas.
- 13.3 Dikes, Impounding Walls, and Drainage Channels for Non-LNG Storage.
- 13.4 Other Impounding Areas.
- 13.5 Volumetric Capacity.
- 13.6 Enclosed Drainage Channels.
- 13.7 Enclosed Impounding Systems.
- 13.8 Dikes and Impounding Walls.
- 13.9 Secondary Containment.
- 13.10 Pipe Penetrations.
- 13.11 Insulation Systems.
- 13.12 Impounding Area Wall Height and Distance to Containers.
- 13.13 Water Removal for Hazardous Liquid Impounding Areas.
- Chapter 14 Mobile and Temporary LNG Facility [Go to Page]
- 14.1 Temporary Service Use.
- 14.2 Odorization Equipment.
- Chapter 15 Transfer Systems for Hazardous Fluids [Go to Page]
- 15.1 Scope.
- 15.2 General Requirements.
- 15.3 Piping System.
- 15.4 Pump and Compressor Control.
- 15.5 Marine Shipping and Receiving.
- 15.6 Tank Vehicle, Tank Car, and ISO Container Loading and Unloading Facilities.
- 15.7 Pipeline Shipping and Receiving.
- 15.8 Hoses and Arms.
- 15.9 Communications and Lighting.
- Chapter 16 Fire Protection, Safety, and Security [Go to Page]
- 16.1 Scope.
- 16.2 General.
- 16.3 ESD Systems.
- 16.4 Hazard Detection.
- 16.5 Fire Protection Water Systems.
- 16.6 Fire Extinguishing and Other Fire Control Equipment.
- 16.7 Personnel Safety.
- 16.8 Security.
- Chapter 17 Requirements for Stationary Applications for Small Scale LNG Facilities [Go to Page]
- 17.1 Scope.
- 17.2 Control Rooms.
- 17.3 Plant Siting.
- 17.4 Plant Layout.
- 17.5 Process Equipment.
- 17.6 Stationary LNG Storage.
- 17.7 Vaporization Facilities.
- 17.8 Piping Systems and Components.
- 17.9 Instrumentation and Electrical Services.
- 17.10 Plant Facilities Design.
- 17.11 Impounding Area and Drainage System Design Capacity.
- 17.12 Transfer Systems for Hazardous Fluids.
- 17.13 Fire Protection, Safety, and Security.
- 17.14 Operating, Maintenance, and Personnel Training.
- Chapter 18 Operating, Maintenance, and Personnel Training [Go to Page]
- 18.1 Scope.
- 18.2 General Requirements.
- 18.3 Manual of Operating Procedures.
- 18.4 Emergency Procedures.
- 18.5 Incident Investigation Protocol.
- 18.6 Security Procedures.
- 18.7 Monitoring Operations.
- 18.8 Commissioning.
- 18.9 Transfer of LNG and Flammables.
- 18.10 Maintenance Manual.
- 18.11 Maintenance.
- 18.12 Personnel Training.
- 18.13 Records.
- Chapter 19 Performance-Based LNG Plant Siting Using Quantitative Risk Analysis (QRA) [Go to Page]
- 19.1 Scope.
- 19.2 General Requirements.
- 19.3 Definitions.
- 19.4 Risk Calculations and Basis of Assessment.
- 19.5 LNG and Other Hazardous Materials Release Scenarios.
- 19.6 Release Probabilities and Conditional Probabilities.
- 19.7 Modeling Conditions and Occurrence Probabilities.
- 19.8 Hazard and Consequence Assessment.
- 19.9 Risk Result Presentation.
- 19.10 Risk Tolerability Criteria.
- 19.11 Risk Mitigation Approaches.
- Annex A Explanatory Material
- Annex B Seismic Design of LNG Plants
- Annex C Informational References [Go to Page]