Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

BS IEC 62888-6:2019 Railway applications. Energy measurement on board trains - Requirements for purposes other than billing, 2019
- undefined
- English [Go to Page]
- CONTENTS
- FOREWORD
- INTRODUCTION
- Figures [Go to Page]
- Figure 1 – EMS functional structure and dataflow diagram
- 1 Scope
- 2 Normative references
- Tables [Go to Page]
- Table 1 – Levels of performance [IEC 62888-1:2018, Table 1]
- 3 Terms, definitions, abbreviated terms and symbols [Go to Page]
- 3.1 Terms and definitions
- 3.2 Abbreviated terms
- 3.3 Symbols
- 4 Requirements [Go to Page]
- 4.1 General [Go to Page]
- 4.1.1 Overview
- 4.1.2 Applications and usage
- 4.1.3 Measurement system configuration
- 4.1.4 Data to be acquired
- 4.2 Requirement amendments to IEC 62888-1 [Go to Page]
- 4.2.1 General [IEC 62888-1:2018, 4.1]
- 4.2.2 System level requirements [IEC 62888-1:2018, 4.2]
- 4.2.3 Device level requirements [IEC 62888-1:2018, 4.3]
- 4.3 Requirement amendments to IEC 62888-2 [Go to Page]
- 4.3.1 General [IEC 62888-2:2018, 4.1]
- 4.3.2 Energy Measurement Function (EMF) [IEC 62888-2:2018, 4.2]
- Table 2 – EMF percentage error limits at reference conditionsfor Level 3 [IEC 62888-2:2018, Table 2] [Go to Page]
- 4.3.3 Sensors [IEC 62888-2:2018, 4.3]
- Table 3 – Level 3 additional percentage error limits – VMF [IEC 62888-2:2018, Table 3]
- Table 4 – Level 3 additional percentage error limits –AC CMF [IEC 62888-2:2018, Table 7]
- Table 5 – Level 3 additional percentage error limits –DC CMF [IEC 62888-2:2018, Table 8] [Go to Page]
- 4.3.4 Energy Calculation Function (ECF) [IEC 62888-2:2018, 4.4]
- Table 6 – Level 3 ECF additional percentage error limits for active energy[IEC 62888-2:2018, Table 15]
- Figure 2 – Primary current and voltage ranges [IEC 62888-2:2018, Figure 6]
- 4.4 Requirement amendments to IEC 62888-3 [Go to Page]
- 4.4.1 General [IEC 62888-3:2018, 4.1]
- 4.4.2 Time data [IEC 62888-3:2018, 4.2]
- 4.4.3 Energy data [IEC 62888-3:2018, 4.3]
- 4.4.4 Location data [IEC 62888-3:2018, 4.4]
- 4.4.5 Other received or produced data [IEC 62888-3:2018, 4.5]
- 4.4.6 Consumption point ID [IEC 62888-3:2018, 4.6]
- 4.4.7 Production of CEMD [IEC 62888-3:2018, 4.7]
- 4.4.8 DHS data storage [IEC 62888-3:2018, 4.8]
- 4.4.9 Transmission of CEMD from DHS to DCS [IEC 62888-3:2018, 4.9]
- 4.4.10 Marking and essential information [IEC 62888-3:2018, 4.10]
- 4.4.11 Event recording [IEC 62888-3:2018, 4.11]
- 4.4.12 DCS [IEC 62888-3:2018, 4.12]
- 4.5 Requirement amendments to IEC 62888-4 [Go to Page]
- 4.5.1 Overview [IEC 62888-4:2018, 4.1]
- 4.5.2 On board communication subsystem [IEC 62888-4:2018, 4.2]
- 4.5.3 On board to ground communication subsystem [IEC 62888-4:2018, 4.3]
- 4.5.4 Access security [IEC 62888-4:2018, 4.4]
- 4.6 Amendments to conformance test approach in IEC 62888-5 [Go to Page]
- 4.6.1 General [IEC 62888-5:2018, 4.1]
- 4.6.2 Situation of applicability [IEC 62888-5:2018, 4.2]
- 4.6.3 General methodology [IEC 62888-5:2018, 4.3]
- 4.6.4 EMS system level specific methodology [IEC 62888-5:2018, 4.4]
- 5 Conformance test [Go to Page]
- 5.1 General
- 5.2 Conformance test amendments to IEC 62888-2 [Go to Page]
- 5.2.1 General [IEC 62888-2:2018, 5.1]
- 5.2.2 Testing framework [IEC 62888-2:2018, 5.2]
- 5.2.3 Design review [IEC 62888-2:2018, 5.3]
- 5.2.4 Type testing [IEC 62888-2:2018, 5.4]
- Figure 3 – Test point matrix for ECF accuracy tests (type test)[IEC 62888-2:2018, Figure 8] [Go to Page]
- 5.2.5 Routine test [IEC 62888-2:2018, 5.5]
- 5.3 Conformance test amendments to IEC 62888-3 [Go to Page]
- 5.3.1 Procedural framework [IEC 62888-3:2018, 5.1]
- Figure 4 – Test point matrix for ECF accuracy tests (routine test) [IEC 62888-2:2018, Figure 15] [Go to Page]
- 5.3.2 Testing framework [IEC 62888-3:2018, 5.2]
- 5.3.3 Design review [IEC 62888-3:2018, 5.3]
- 5.3.4 Type test [IEC 62888-3:2018, 5.4]
- 5.3.5 Routine testing [IEC 62888-3:2018, 5.5]
- 5.4 Conformance test amendments to IEC 62888-4 [Go to Page]
- 5.4.1 General [IEC 62888-4:2018, 5.1]
- 5.4.2 PICS and PIXIT [IEC 62888-4:2018, 5.2]
- 5.4.3 Design review [IEC 62888-4:2018, 5.3]
- 5.4.4 Type test procedure [IEC 62888-4:2018, 5.4]
- 5.5 Amendments to conformance test procedures [IEC 62888-5:2018, 5] [Go to Page]
- 5.5.1 General [IEC 62888-5:2018, 5.1]
- 5.5.2 EMS integration design review [IEC 62888-5:2018, 5.2]
- 5.5.3 EMS integration type test [IEC 62888-5:2018, 5.3]
- 5.5.4 EMS installation design review [IEC 62888-5:2018, 5.4]
- 5.5.5 EMS Installation type test [IEC 62888-5:2018, 5.5]
- 5.5.6 EMS installation routine test [IEC 62888-5:2018, 5.6]
- 5.5.7 Periodic re-verification [IEC 62888-5:2018, 5.7]
- 5.5.8 Replacement of devices and ancillary components [IEC 62888-5:2018, 5.8]
- 6 Amendments to the relevant Annexes in IEC 62888-1 to IEC 62888-5 [Go to Page]
- 6.1 Amendments to Annexes in IEC 62888-1:2018
- 6.2 Amendments to Annexes in IEC 62888-2:2018 [Go to Page]
- 6.2.1 Annex A (normative) Test with magnetic induction of external origin [IEC 62888-2:2018]
- 6.2.2 Annex B (normative) EMF configurations [IEC 62888-2:2018]
- 6.2.3 Annex C (informative) Expressing EMF accuracy [IEC 62888-2:2018]
- 6.2.4 Annex D (informative) Re-verification and defining of its regime recommendations [IEC 62888-2:2018]
- 6.2.5 Annex E (informative) Durability test [IEC 62888-2:2018]
- 6.3 Amendments to Annexes in IEC 62888-3:2018
- 6.4 Amendments to Annexes in IEC 62888-4:2018 [Go to Page]
- 6.4.1 Annex A (normative) On board to ground communication preferred solution [IEC 62888-4:2018]
- 6.4.2 Annex B (informative) VEI–VMF/CMF to ECF interface implementation example [IEC 62888-4:2018]
- 6.4.3 Annex C (informative) PICS structure and instruction [IEC 62888-4:2018]
- 6.4.4 Annex D (informative) Access security [IEC 62888-4:2018]
- 6.5 Amendments to Annexes in IEC 62888-5:2018
- Annex A (informative)Examples of installation points in caseof distributed measurement [Go to Page]
- A.1 General
- A.2 DC power supply [Go to Page]
- A.2.1 ECF function in TCN
- A.2.2 Substantial data for energy measurement on board, e.g. current and voltage
- Figure A.1 – An example of ECF function in TCN for DC power supply
- A.3 AC power supply
- Figure A.2 – An example of only current and voltagemeasured on board for DC power supply
- Figure A.3 – An example of ECF function in control unit for AC power supply
- Annex B (informative)Measurement of non-sinusoidal waveform
- Annex C (informative)The differences between Level 1, Level 2 and Level 3 [Go to Page]
- Table C.1 – The differences between Level 1, Level 2 and Level 3
- Bibliography [Go to Page]