Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

BS EN 50131-8:2019 Alarm systems. Intrusion and hold-up systems - Security fog devices, 2019
- undefined
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviations [Go to Page]
- 3.1 Terms and definitions
- 3.2 Abbreviations
- 4 Environmental requirements [Go to Page]
- 4.1 Environmental classification
- 4.2 Environmental tests
- 4.3 Immunity to electromagnetic interferences
- 4.4 IP/IK rating
- 5 Access levels
- 6 Protection requirements [Go to Page]
- 6.1 General
- 6.2 Product safety
- 6.3 EMC
- 6.4 Non-toxicity
- 6.5 Pressure vessels requirements
- 6.6 Labels and warnings
- 6.7 Energy efficiency
- 6.8 Warning signs
- 7 Functional requirements [Go to Page]
- 7.1 Performance
- 7.2 Operation during mains failure
- 7.3 Operation with mains only
- 7.4 Additional requirement for equipment using radio frequency interconnections
- 7.5 Tamper
- 7.6 SFD damage/neutralisation
- 7.7 Ejection nozzle [Go to Page]
- 7.7.1 Nozzle protection
- 7.7.2 Nozzle blocked or obstructed
- 7.8 Fog eject limiter
- 7.9 Stopping fog generation
- 7.10 Heater block - temperature
- 7.11 Heater block - overheating
- 7.12 Isolation of the SFD
- 7.13 Fixings
- 7.14 Visual Indications
- 7.15 Communication between the SFD and the I&HAS [Go to Page]
- 7.15.1 General
- 7.15.2 Minimum information to be communicated
- 7.15.3 Non-critical faults
- 7.15.4 Optional signals
- 7.16 Fault monitoring
- 7.17 Power failure
- 8 Consumables [Go to Page]
- 8.1 General
- 8.2 Formulation
- 8.3 Traceability
- 9 Marking
- 10 Documentation
- 11 Design, installation, operation and maintenance
- Annex A (normative)Performance tests [Go to Page]
- A.1 General
- A.2 Fog test chamber
- A.3 Test procedure
- A.4 Activation test
- A.5 Fog output of EUT
- A.6 Fog persistency
- A.7 Fog output over test periods
- A.8 Fog visibility/density table
- A.9 Performance data
- Annex B (normative)SFD warning sign [Go to Page]
- B.1 Warning sign requirements
- Annex C (normative)Measurement procedure for power in idle mode [Go to Page]
- C.1 Test room (EN 50564:2011, 4.2)
- C.2 Power supply (EN 50564:2011, 4.3)
- C.3 Measuring instruments (EN 50564:2011, 4.4)
- C.4 Preparation of unit under test (EN 50564:2011, 5.2)
- C.5 Test setup
- C.6 Measurement (EN 50564:2011, 5.3.2)
- C.7 Reporting
- Annex D (informative)Guidance on design, installation, operationand maintenance of the SFD [Go to Page]
- D.1 Risk assessment
- D.2 General notification
- D.3 Verified alarm triggering
- D.4 Multi-occupancy
- D.5 Man trap – building unoccupied
- D.6 Hold-up – Building occupied
- D.7 Installed SFD test
- D.8 Training
- D.9 Manufacturers requirements [Go to Page]