Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

Insulated Precast Enclosures: Strategies for Controlling Performance, Quality, and Cost, 2024
- Slide 1
- Slide 2: Insulated Precast Enclosures: Strategies for Controlling Performance, Quality, and Cost
- Slide 3
- Slide 4: How to Use This Online Learning Course
- Slide 5: Purpose and Learning Objectives
- Slide 6: Contents
- Slide 7: EXTERIOR WALL PANEL BASICS
- Slide 8: Noncomposite Wall Panels
- Slide 9: Composite Wall Panels
- Slide 10: Wythe Connector Options
- Slide 11: CFRP Grid Truss Wythe Connectors
- Slide 12: CFRP Grid Truss Wythe Connector Strength
- Slide 13: CFRP Grid Truss Wythe Connectors in Monolithic Wall Panels
- Slide 14: CFRP Grid Truss Wythe Connectors in Monolithic Wall Panels
- Slide 15: PANEL MANUFACTURING, TESTING, AND INSTALLATION
- Slide 16: Panel Manufacturing and Insulation
- Slide 17: Panel Manufacturing and Insulation
- Slide 18: Additional Insulation Options
- Slide 19: Panel Manufacturing: Initial Step
- Slide 20: Panel Manufacturing: Second Step
- Slide 21: Panel Manufacturing: Decorative Finish
- Slide 22: Panel Manufacturing: Decorative Finish
- Slide 23: Panel Manufacturing: Decorative Finish
- Slide 24: Panel Manufacturing: Decorative Finish
- Slide 25: Panel Installation
- Slide 26: Panel Testing: Concrete Strength
- Slide 27: Panel Testing: Panel Strength
- Slide 28: Panel Testing: Fire Resistance
- Slide 29: Review Question
- Slide 30: Answer
- Slide 31: THERMAL STANDARDS AND PERFORMANCE
- Slide 32: Evolving Climate Patterns
- Slide 33: Current Thermal Performance Standards
- Slide 34: Thermal Performance: R-Values
- Slide 35: Thermal Performance: Evolving Standards
- Slide 36: The Importance of Detailing: Continuous Insulation
- Slide 37: Thermal Performance
- Slide 38: Thermal Performance
- Slide 39: Precast Aesthetics and Quality
- Slide 40: Articulation: Cornices and Eyebrows
- Slide 41: Articulation: Cornices and Eyebrows
- Slide 42: Articulation: Reveals and Rustications
- Slide 43: Stone Clad (Veneer) Precast
- Slide 44: Stone Clad Precast
- Slide 45: Embedded Thin Brick
- Slide 46: Embedded Thin Brick
- Slide 47: Formliners
- Slide 48: Formliners
- Slide 49: Surface Finishes
- Slide 50: Surface Finishes
- Slide 51: Review Question
- Slide 52: Answer
- Slide 53: COST EFFICIENCY STRATEGIES
- Slide 54: Cost Efficiency: Planning for Precast
- Slide 55: Cost Efficiency: Master Mold
- Slide 56: Cost Efficiency: Panel Size Impact on Costs
- Slide 57: Cost Efficiency: Repetition
- Slide 58: Review Question
- Slide 59: Answer
- Slide 60: PROJECT EXAMPLES
- Slide 61: Hilton Hotel, Des Moines, IA
- Slide 62: Hilton Hotel, Des Moines, IA
- Slide 63: Hilton Hotel, Des Moines, IA
- Slide 64: Sandy High School, Sandy, OR
- Slide 65: Sandy High School, Sandy, OR
- Slide 66: Sandy High School, Sandy, OR
- Slide 67: Girls Inc. Facility, Omaha, NE
- Slide 68: Girls Inc. Facility, Omaha, NE
- Slide 69: Girls Inc. Facility, Omaha, NE
- Slide 70: Universal Alloy Light Press Plant, Ball Ground, GA
- Slide 71: Universal Alloy Light Press Plant, Ball Ground, GA
- Slide 72: Universal Alloy Light Press Plant, Ball Ground, GA
- Slide 73: Universal Alloy Light Press Plant, Ball Ground, GA
- Slide 74: Piedmont Central Student Housing and Dining Hall, Atlanta
- Slide 75: Piedmont Central Student Housing and Dining Hall, Atlanta
- Slide 76: Piedmont Central Student Housing and Dining Hall, Atlanta
- Slide 77: SUMMARY
- Slide 78: Summary
- Slide 79: Thank You [Go to Page]