Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

NFPA 285: What We’ve Learned, What’s Changed, and What We Thought We Knew, 2025
- Slide 1
- Slide 2: NFPA 285: What We’ve Learned, What’s Changed, and What We Thought We Knew
- Slide 3
- Slide 4: How to Use This Online Learning Course
- Slide 5: Purpose and Learning Objectives
- Slide 6: Contents
- Slide 7: What Is NFPA 285?
- Slide 8: What Is NFPA 285?
- Slide 9: What Is the NFPA 285 Fire Test?
- Slide 10: Purpose of NFPA 285
- Slide 11: Purpose of NFPA 285
- Slide 12: Purpose of NFPA 285
- Slide 13: NFPA 285 and Building Code: History
- Slide 14: What Is Driving NFPA 285 Today?
- Slide 15: What Is Driving NFPA 285 Today?
- Slide 16: What Is Driving NFPA 285 Today?
- Slide 17: What Is Driving NFPA 285 Today?
- Slide 18: International Building Code® Requirements
- Slide 19: When Is NFPA 285 Required? Types of Construction
- Slide 20: 2021 IBC, Chapter 6, Types of Construction Table 601 Fire-Resistance Rating Requirements for Building Elements (Hours)
- Slide 21: When Is NFPA 285 Required? Application/Material
- Slide 22: 2021 IBC, Chapter 7, Fire and Smoke Protection Features
- Slide 23: 2021 IBC, Chapter 14, Exterior Walls
- Slide 24: 2021 IBC, Chapter 14, Exterior Walls
- Slide 25: 2021 IBC, Chapter 15, Roof Assemblies and Rooftop Structures
- Slide 26: 2021 IBC, Chapter 26, Plastic
- Slide 27: 2021 IBC, Chapter 26, Plastic
- Slide 28: IBC, NFPA 285, and Foam Plastic in Exterior Walls
- Slide 29: IBC, NFPA 285, and Water-Resistive Barriers (WRBs)
- Slide 30: Review Question
- Slide 31: Answer
- Slide 32: NFPA 285 Testing
- Slide 33: Conducting an NFPA 285 Test
- Slide 34: Conducting an NFPA 285 Test
- Slide 35: Conducting an NFPA 285 Test
- Slide 36: ASTM E119 vs. NFPA 285
- Slide 37: ASTM E2307 vs. NFPA 285
- Slide 38: Conducting an NFPA 285 Test
- Slide 39: Steel Stud/Masonry Veneer Wall System NFPA 285 Actual Test Results
- Slide 40: Steel Stud/Masonry Veneer Wall System NFPA 285 Actual Test Results
- Slide 41: Steel Stud/Masonry Veneer Wall System NFPA 285 Actual Test Results
- Slide 42: Steel Stud/Masonry Veneer Wall System NFPA 285 Actual Test Results
- Slide 43: Steel Stud/Masonry Veneer Wall System NFPA 285 Actual Test Results
- Slide 44: Review Question
- Slide 45: Answer
- Slide 46: Complying with NFPA 285: Details to Consider
- Slide 47: Designing Compliant Walls with Components
- Slide 48: Structural Wall Options
- Slide 49: Stud Cavity Insulation Options
- Slide 50: Continuous Insulation (ci) + Cladding
- Slide 51: Continuous Insulation (ci) + Cladding
- Slide 52: Wall Configuration Options
- Slide 53: Air/Water-Resistive Barrier Options
- Slide 54: Opening Details
- Slide 55: Opening Details: Headers
- Slide 56: Opening Details: Jambs
- Slide 57: Opening Details: Sills
- Slide 58: Review Question
- Slide 59: Answer
- Slide 60: Documenting NFPA 285 Compliance
- Slide 61: Compliance Options
- Slide 62: Testing for NFPA 285 Compliance
- Slide 63: NFPA 285 Test Reports
- Slide 64: Engineering Analysis
- Slide 65: UL Solutions Public Directory
- Slide 66: UL Public Directory
- Slide 67: Summary and Resources
- Slide 68: Summary
- Slide 69: Resources
- Slide 70: Thank You [Go to Page]